Storm Water Projects

Storm Water Projects

Logo for Annie Area Interim Drainage Improvements

Annie Area Interim Drainage Improvements

The Annie Area Interim Drainage Improvements project alleviated flooding from properties on Holland Avenue and Annie Street. The project consisted of replacing the sidewalk bridge on Holland Avenue, adding...

Logo for Biering Lane Interim Drainage Improvements

Biering Lane Interim Drainage Improvements

The Biering Lane Interim Drainage Improvements project completed a design to help alleviate flooding to the Oakridge Point Neighborhood. Phase: CompletedFor more information: Joe Hinojosa, (210)...

Logo for Blue Crest Drainage

Blue Crest Drainage

The Blue Crest Drainage project constructed an easement across a property on Blue Crest and a channel to capture water flow coming from upstream to alleviate flooding to properties on Plumeria Street and...

Breeden - West Russell Area Drainage Improvements

The Breeden - West Russell Area Drainage Improvements project included two phases. Phase 1 included an underground drainage system to alleviate flooding issues associated with the lack of a drainage...

Logo for Briarmall Drainage System

Briarmall Drainage System

The Briarmall Drainage System project constructed a storm water system comprised of channels, inlets, and an underground drainage system to better capture, contain, and convey storm water downstream impacting...

Logo for Castleridge/Slick Ranch Floodplain Improvements

Castleridge/Slick Ranch Floodplain Improvements

The Castleridge/Slick Ranch Floodplain Improvements project will reconstruct a natural earthen channel, removing 395 properties from the 100-year floodplain.Phase: ConstructionFor more information: Joe...

Logo for Churchill Avenue Area Drainage Improvements

Churchill Avenue Area Drainage Improvements

The Churchill Avenue Area Drainage Improvements project constructed a drainage system comprised of culvert crossings and an earthen channel, and improved low water crossings at Chole Drive, Churchill...

Logo for Concepcion Creek Drainage Project

Concepcion Creek Drainage Project

WelcomeThe City is exploring solutions to reduce flooding risks in the Concepción Creek watershed. As new Federal Emergency Management Agency (FEMA) flood maps are proposed, the City needs a plan...

Logo for Contessa Drive Drainage Improvements

Contessa Drive Drainage Improvements

The Contessa Drive Drainage Improvements project alleviated flooding along Contessa Drive. Improvements included new underground storm drainage infrastructure, street reconstruction, as well as new curbs,...

Logo for Crestfield Area Drainage Improvements

Crestfield Area Drainage Improvements

The Crestfield Area Drainage Improvements project alleviated flooding within the surrounding neighborhood. Improvements included the construction of a concrete channel, outfall structures, energy dissipators,...

Logo for D10 Drainage Improvements-Fox Run - DRAFT

D10 Drainage Improvements-Fox Run - DRAFT

The houses at 6303, 6300 and 6303 Fox Head are being impacted.  This project will provide relief by intercepting the flow at the back fence line and channeling it underground between 6300 and 6303...

Logo for Jo Marie Area Drainage Improvements

Jo Marie Area Drainage Improvements

The Jo Marie Area Drainage Improvements project constructed a new underground drainage system to alleviate flooding along Jo Marie Street.Phase: CompleteFor more information: Joe Hinojosa, (210)...

Logo for Menchaca Street Drainage Improvements

Menchaca Street Drainage Improvements

The Menchaca Street Drainage Improvements project alleviated drainage concerns for properties along the northside of Menchaca Street. Improvements included regrading the street’s cross-section to...

Logo for Michael Avenue Drainage Improvements

Michael Avenue Drainage Improvements

The Michael Avenue Drainage Improvements project alleviated ponding water impacting properties and within the street. Improvements included realignment and regrading of the adjacent channel. Phase:...

Logo for Moss Brook Area Drainage

Moss Brook Area Drainage

The Moss Brook Area Drainage project alleviated flooding on properties along Moss Brook Drive. Improvements included reconstructing an existing concrete V-shaped channel to a rectangular channel, street...

Logo for Orsinger Low Water Crossing

Orsinger Low Water Crossing

The Orsinger Low Water Crossing (LWC) #35 project included channel improvements, street reconstruction, and the replacement of an existing small pipe culvert on Orsinger with larger box culverts. Phase: CompleteProject...

Logo for Parham Street Drainage Improvements

Parham Street Drainage Improvements

This Parham Street Drainage Improvements project will include street reconstruction and a drainage system to alleviate flooding and properly convey water runoff into the existing earthen...

Logo for Pembroke Interim Drainage Improvements

Pembroke Interim Drainage Improvements

The Pembroke Interim Drainage Improvements project alleviated storm water runoff onto a property on Pembroke Road. Improvements included an earthen berm, earthen pilot channel, and an outfall. Phase: CompleteProject...

Logo for Pinn Road LWC Safety Improvements

Pinn Road LWC Safety Improvements

The Pinn Road LWC Safety Improvements Project will include the installation of Advanced Warning devices for vehicular and pedestrian traffic around low water crossings. The devices will include mast arms,...

Riverwalk Gate 5 Replacement

The Riverwalk Gate 5 Replacement project will be replacing Gate 5 located at the southwest quadrant of E. Nueva and Jack White intersection. This gate is utilized to control water levels along the Riverwalk...

Logo for South Gevers St. Drainage Improvements Phase 1

South Gevers St. Drainage Improvements Phase 1

The South Gevers St. Drainage Improvements Phase 1 project included the installation of an underground drainage system along South Gevers Street and tied it into an existing underground system along Nopal...

Logo for Thousand Oaks Erosion Protection

Thousand Oaks Erosion Protection

The Thousand Oaks Erosion Protection project included the construction of a culvert drainage system east of Thousand Oaks Drive and an outfall to an existing drain bluff adjacent to David Edwards...

Logo for Woller Road Interim Drainage Improvements

Woller Road Interim Drainage Improvements

The Woller Road Interim Drainage Improvements project included the combination of a flume and roadwork designed to move water out of the Woller Road and Corian Path intersection into the adjoining drainage...

Logo for WW White/MLK Interim Drainage Improvements

WW White/MLK Interim Drainage Improvements

The WW White/MLK Interim Drainage Improvements project alleviated localized flooding along the west side of WW White Road at Martin Luther King Drive, specifically at the VIA bus stop north of the intersection....